THE BUILDING OF OUR NEW SCHOOL
 
Click on Building Blog to see how it was built
 
 
 

Mike Walmsley
was in charge of building our new school build

Ready to go!!!

Can we recycle this?

Removing the retaining wall

     

 Foundations ready to be poured

                            Steel begins!

 

Christ The King Primary School

 

 

Site consists of the existing St Edwards Catholic Primary School, a two storey 1960's building which is to be demolished and replaced with the new single storey school, renamed as Christ the King Primary School. The building and external areas have been designed to sit on the existing so as to not encroach on the playing fields. The school will be multi-faith for 210 pupils.

 

 

 

  

The building will rated under the BREEAM (BRE Environmental Assessment Method). BREEAM addresses wide-ranging environmental and sustainability issues and enables developers and designers to prove the environmental credentials of their buildings to planners and clients. Christ The King is aiming to achieve a ‘Very Good’ rating. The building will benefit from sola panels located on the south facing elevation of the roof. These panels will assist with heating the water used in the underfloor heating system, saving energy sources.

 

 

 

 

Specific Building Details

 

 

  •  Total Building Cost - £3,138,000

 

  •  Services Costs - £600,000

 

  •  External Works – £42,000

 

·      Gross floor area – 1428m2

 

·      Total area of site – 1.3125 hectares

 

·       Function areas and their size

 

- Circulation 186m2

- Classrooms 504m2

- Group rooms 70m2

- Hall 180m2

- Library 32m2

- Staff Areas 140m2

- Store 175m2

- WC’s 75m2

 

 

·     % area of grounds to be used by community - Approx 3,000m² (Playing Fields)

 

·      % area of buildings to be used by community

 

- Hall - 180m²

- Entrance 17m²

- Disables WC 3m²

 

= 200m2 in total

 

 

·      Predicted electricity consumption - 32kWh/m2/annum

 

·      Predicted fossil fuel consumption -164kWh/m2/annum

 

·      Predicted renewable energy generation - 10.94kWh/m2/annum

 

·      Predicted water use -m3/person/year 4.5m3/person/annum

 

· The steps taken during the construction process to reduce environmental impacts, i.e. innovative construction management techniques

 

 

· A list of any social or economically sustainable measures achieved/piloted.

 